Case study — Bootle, August 2026
A buyer in Bootle asked us to survey the roof of a Victorian terraced house before exchange. The vendor's paperwork said nothing about the roof. Ninety minutes on the property, nine photographs and a written report later, the buyer had the evidence to negotiate £6,000 off the agreed price — more than twenty-five times the cost of the survey.
“Ninety minutes on the roof. Nine photographs. £6,000 off the price.”
The vendor’s homebuyer survey had been done from the pavement. Every defect below was above the eaves.
The numbers
The buyer had already had a homebuyer’s survey. It flagged nothing on the roof, because the surveyor never left the ground. Our survey was carried out from ladder and roof level and covered the bay roof, both party-wall junctions, the ridge, the verges and the chimney. Below is the evidence exactly as it went into the report — with the property details removed.
📄 Download the sample survey report (PDF)
The full anonymised report, 8 pages, as the buyer’s solicitor received it (prices removed).
The evidence
Two-storey Victorian terrace with a two-storey bay to the front, a flat roof over the bay, a main pitched roof in concrete interlocking tiles, and a brick chimney stack shared with the neighbour. From the pavement the roof looked ordinary. Nothing below was visible without going up.
The survey was carried out from ladder and roof level, not from the street. Most of what follows cannot be seen from the ground, which is exactly why a homebuyer's survey missed it.
GRP (fibreglass) covering over the bay with a visibly thin, patchy laminate. Insufficient resin was used in the original application: the glass mat is exposed in places, the surface is chalky, and water was tracking through into the bay ceiling below.
A GRP roof relies on the mat being fully wetted out with resin; a starved laminate is porous. This roof cannot be patched reliably and needs a complete resurface.
Where the roof meets the neighbouring property, a strip of roofing felt has been used to bridge the two roofs instead of a proper bonding gutter. The felt has corroded, split and lifted, leaving the timbers below exposed.
A felt strip is not an acceptable detail at a party-wall junction. It does not provide the resistance to moisture required under Approved Document C of the Building Regulations and it was already letting water in.
Close-up of the failed felt with the batten and the neighbour's slate roof beneath. Water has been running behind the felt and down the party wall line.
This is the single most serious defect on the roof. A secret (bonding) gutter formed in lead or GRP is the correct repair.
Several tiles at the verge and near the ridge have slipped or come away entirely, exposing the underlay. Fragments of broken tile were lying loose on the roof surface.
Loose tiles are a safety risk as well as a leak risk. All displaced tiles need to be refixed with clips and nails; the fallen ones replaced.
The mortar bed to the ridge tiles has failed along the full length of the ridge. Gaps are visible under the ridge tiles and broken mortar has fallen onto the roof slopes.
With the bed gone the ridge tiles are held by nothing but their own weight. In a gale they will come off. The ridges need lifting, all failed mortar removing, and re-bedding and re-pointing.
Hollow, cracked bedding under the ridge with the tile beneath sitting proud. Moss is established in the open joints, holding water against the underlay.
Same defect, second location. The whole ridge run is affected, not an isolated section.
Brick chimney with eroded mortar joints on all visible faces, open joints below the corbelled brickwork and vegetation growing from the top courses.
Open joints allow water into the stack and, in winter, into the flue and chimney breast below. Full repointing is required.
The flaunching (the mortar cap on top of the stack) is heavily weathered, cracked and covered in moss and lichen, with a loose brick lying in it.
Failed flaunching lets water into the top of the stack and loosens the pots. It needs breaking off and replacing.
The recommendations
Each item was costed separately in the report so the buyer, their solicitor and the vendor could see where the money went. The main tiled slopes were sound and were reported as such.
The outcome
The buyer sent the report to their solicitor and to the estate agent. Faced with dated photographs, a defect-by-defect explanation and a costed list of works, the vendor agreed to reduce the sale price by £6,000. The purchase went through with the roofing budget built in.
What this job teaches
The RICS Level 2 survey on this property was done from the ground with binoculars. Every defect listed above was above the eaves.
Nobody argues with a picture of a felt strip where a gutter should be. The report is written so a solicitor or agent with no roofing knowledge understands it in one read.
Ridges, party walls, chimneys and the bay were the problems. The main tiled slopes were fine. That is typical of a Victorian terrace.
£225 against £6,000 is the headline, but the real value is knowing what you are buying before you have bought it.
Questions
Our Professional Roof Survey Report is £225 inc VAT, fixed fee, with a written PDF report within three working days. It is backed by our professional indemnity insurance.
No. Sometimes the roof is fine and the report says so, which is worth knowing too. Where we do find defects, buyers regularly use the report to renegotiate or to have the work done before completion.
Yes. We cover the whole of Sefton, West Lancashire, Knowsley and the Liverpool suburbs from our base in Formby.
We can, but you are under no obligation. The report stands on its own and you are free to take it to any roofer.
Related: Professional Roof Survey Report — Bootle · Free Roof Inspection — Bootle · What happens during a roof survey · Survey reports across Merseyside · Chimney repairs Bootle · Flat roofs Bootle
£225 inc VAT, fixed fee — written report within 3 working days, backed by our professional indemnity insurance.
Get in touch
£225 inc VAT, fixed fee — a formal, PI-insured written report delivered within 3 working days. Fill in the form below or message us directly on WhatsApp, whichever's easier.
Prefer to message us directly?
💬 WhatsApp Us Now